Hygienic Cladding Compliance Checklist
Essential Requirements for Commercial Kitchen, Healthcare, Pharmaceutical & Laboratory Installations
NextGenClad Ltd - Specialist Installation Services
Tel: 07305 946348 | Email: andy.mac88@hotmail.com
Pre-Installation Compliance Assessment
Substrate Evaluation
- Substrate moisture content tested (<75% RH required)
- Surface flatness verified (±3mm over 2m)
- Structural integrity confirmed
- Existing surface contamination assessed
- Substrate compatibility with adhesive systems verified
Regulatory Requirements Identification
- Sector-specific standards identified (HACCP/GMP/HTM 64/ISO 14644)
- Fire safety classification requirements confirmed (BS EN 13501)
- Local building regulations reviewed
- Environmental health requirements documented
- Client specification requirements clarified
Material Selection & Certification
- Cladding system specified for project requirements
- Fire rating certificates obtained
- Antimicrobial certification verified (where required)
- Chemical resistance data reviewed
- Material safety data sheets (MSDS) available
- CE marking and DoP (Declaration of Performance) confirmed
Installation Standards Compliance
Fire Safety Compliance
- BS EN 13501 fire classification maintained
- Fire barriers installed at compartment boundaries
- Cavity barriers fitted where required
- Fire-rated sealants used at penetrations
- Installation methods preserve material fire rating
- Fire stopping completed to Building Regulations
Hygiene Standards
- Seamless welded joints achieved (no grout lines)
- Impervious surface integrity maintained
- Cove and corner details properly formed
- Drainage integration completed correctly
- Surface smoothness verified (no bacterial harbourage points)
- Cleaning access considerations addressed
Welding Quality Assurance
- Hot air welding equipment calibrated
- Welding temperature verified (appropriate for material)
- Weld seam continuity checked
- Weld strength tested (pull test where required)
- Excess weld rod trimmed flush
- Visual inspection of all welds completed
Installation Workmanship
- Panel alignment within tolerance (±2mm)
- Joint gaps minimized (<1mm before welding)
- Adhesive coverage adequate (>90%)
- Edge profiles correctly installed
- Penetrations sealed properly
- Surface free from defects (bubbles, delamination)
Sector-Specific Compliance
Commercial Kitchens (HACCP)
- Food-safe materials certified
- Impervious surface achieved
- Cleanability verified
- Steam and heat resistance confirmed
- Grease resistance tested
- Environmental Health Officer requirements met
Pharmaceutical (GMP/ISO 14644)
- Cleanroom classification requirements met
- Particle generation minimized
- Chemical resistance verified
- Cleaning validation support provided
- GMP documentation completed
- Sterile area requirements addressed
Healthcare (HTM 64/Infection Control)
- Antimicrobial properties certified
- Infection control standards met
- Chemical disinfectant resistance confirmed
- Impact resistance verified
- HTM 64 guidance followed
- CQC/NHS requirements addressed
Laboratories (COSHH/Safety)
- Chemical resistance data reviewed
- Acid/alkali resistance confirmed
- Solvent resistance verified
- Temperature resistance tested
- Safety regulations compliance
- Laboratory-specific requirements met
Quality Control & Testing
Pre-Completion Checks
- Visual inspection of all surfaces
- Weld integrity verification
- Adhesion spot checks
- Surface flatness measurement
- Joint alignment verification
- Penetration sealing inspection
Performance Testing
- Water tightness testing (where required)
- Pressure testing (wet areas)
- Pull testing of critical welds
- Surface hardness verification
- Chemical resistance spot testing
- Fire performance verification
Final Inspection
- Client walkthrough completed
- Defects list addressed
- Cleaning completed
- Protection installed (if required)
- Handover documentation prepared
- Maintenance guidance provided
Documentation & Certification
Installation Records
- Site survey report
- Material certificates and DoPs
- Installation method statement
- Quality control records
- Photographic evidence
- As-built drawings
Compliance Certification
- Fire safety certification
- Material compliance certificates
- Installation warranty documentation
- Hygiene compliance statement
- Sector-specific certifications
- Handover certificate
Health & Safety Documentation
- Risk assessments (RAMS)
- COSHH assessments
- Method statements
- Safety data sheets
- Emergency procedures
- Incident reports (if applicable)
Post-Installation Requirements
Client Handover
- Cleaning and maintenance guidance provided
- Warranty terms explained
- Emergency contact details supplied
- Spare materials provided (if specified)
- Defects liability period confirmed
- Maintenance schedule recommended
Ongoing Compliance
- Regular inspection schedule established
- Cleaning protocol confirmed
- Maintenance requirements documented
- Re-certification schedule (if applicable)
- Contact for technical support provided
- Future expansion considerations noted
Common Non-Compliance Issues to Avoid
Installation Errors
- Inadequate substrate preparation
- Incorrect adhesive selection or application
- Poor welding technique (cold welds, gaps)
- Misaligned panels and joints
- Inadequate edge sealing
- Damage to material surface
Documentation Failures
- Missing material certificates
- Incomplete installation records
- Absent fire safety documentation
- Inadequate photographic evidence
- Missing as-built drawings
- Incomplete handover documentation
Compliance Oversights
- Fire barriers not installed
- Hygiene standards not met
- Sector-specific requirements missed
- Building regulations not followed
- Client specifications not addressed
- Testing and verification skipped
NextGenClad Compliance Guarantee
At NextGenClad, we ensure every installation meets all applicable compliance standards through:
- Certified Fitters - All installers trained and certified in leading hygienic cladding systems
- Quality Assurance - Rigorous inspection and testing at every stage
- Complete Documentation - Full compliance certification package provided
- Sector Expertise - Deep understanding of HACCP, GMP, HTM 64, and ISO 14644 requirements
- Project Timeline Guarantee - On-time delivery without compromising compliance
- Ongoing Support - Technical assistance throughout the project lifecycle
Contact NextGenClad for Compliant Installation
Specialist Hygienic Wall Cladding Installation - Manchester & UK-Wide Service
This checklist is provided as a general guide. Specific project requirements may vary. Contact NextGenClad for a detailed compliance assessment for your project.
Document Version: 1.0
Last Updated: January 2025
© NextGenClad Ltd - All Rights Reserved