Hygienic Cladding Compliance Checklist

Essential Requirements for Commercial Kitchen, Healthcare, Pharmaceutical & Laboratory Installations

NextGenClad Ltd - Specialist Installation Services

Tel: 07305 946348 | Email: andy.mac88@hotmail.com

Pre-Installation Compliance Assessment

Substrate Evaluation

  • Substrate moisture content tested (<75% RH required)
  • Surface flatness verified (±3mm over 2m)
  • Structural integrity confirmed
  • Existing surface contamination assessed
  • Substrate compatibility with adhesive systems verified

Regulatory Requirements Identification

  • Sector-specific standards identified (HACCP/GMP/HTM 64/ISO 14644)
  • Fire safety classification requirements confirmed (BS EN 13501)
  • Local building regulations reviewed
  • Environmental health requirements documented
  • Client specification requirements clarified

Material Selection & Certification

  • Cladding system specified for project requirements
  • Fire rating certificates obtained
  • Antimicrobial certification verified (where required)
  • Chemical resistance data reviewed
  • Material safety data sheets (MSDS) available
  • CE marking and DoP (Declaration of Performance) confirmed

Installation Standards Compliance

Fire Safety Compliance

  • BS EN 13501 fire classification maintained
  • Fire barriers installed at compartment boundaries
  • Cavity barriers fitted where required
  • Fire-rated sealants used at penetrations
  • Installation methods preserve material fire rating
  • Fire stopping completed to Building Regulations

Hygiene Standards

  • Seamless welded joints achieved (no grout lines)
  • Impervious surface integrity maintained
  • Cove and corner details properly formed
  • Drainage integration completed correctly
  • Surface smoothness verified (no bacterial harbourage points)
  • Cleaning access considerations addressed

Welding Quality Assurance

  • Hot air welding equipment calibrated
  • Welding temperature verified (appropriate for material)
  • Weld seam continuity checked
  • Weld strength tested (pull test where required)
  • Excess weld rod trimmed flush
  • Visual inspection of all welds completed

Installation Workmanship

  • Panel alignment within tolerance (±2mm)
  • Joint gaps minimized (<1mm before welding)
  • Adhesive coverage adequate (>90%)
  • Edge profiles correctly installed
  • Penetrations sealed properly
  • Surface free from defects (bubbles, delamination)

Sector-Specific Compliance

Commercial Kitchens (HACCP)

  • Food-safe materials certified
  • Impervious surface achieved
  • Cleanability verified
  • Steam and heat resistance confirmed
  • Grease resistance tested
  • Environmental Health Officer requirements met

Pharmaceutical (GMP/ISO 14644)

  • Cleanroom classification requirements met
  • Particle generation minimized
  • Chemical resistance verified
  • Cleaning validation support provided
  • GMP documentation completed
  • Sterile area requirements addressed

Healthcare (HTM 64/Infection Control)

  • Antimicrobial properties certified
  • Infection control standards met
  • Chemical disinfectant resistance confirmed
  • Impact resistance verified
  • HTM 64 guidance followed
  • CQC/NHS requirements addressed

Laboratories (COSHH/Safety)

  • Chemical resistance data reviewed
  • Acid/alkali resistance confirmed
  • Solvent resistance verified
  • Temperature resistance tested
  • Safety regulations compliance
  • Laboratory-specific requirements met

Quality Control & Testing

Pre-Completion Checks

  • Visual inspection of all surfaces
  • Weld integrity verification
  • Adhesion spot checks
  • Surface flatness measurement
  • Joint alignment verification
  • Penetration sealing inspection

Performance Testing

  • Water tightness testing (where required)
  • Pressure testing (wet areas)
  • Pull testing of critical welds
  • Surface hardness verification
  • Chemical resistance spot testing
  • Fire performance verification

Final Inspection

  • Client walkthrough completed
  • Defects list addressed
  • Cleaning completed
  • Protection installed (if required)
  • Handover documentation prepared
  • Maintenance guidance provided

Documentation & Certification

Installation Records

  • Site survey report
  • Material certificates and DoPs
  • Installation method statement
  • Quality control records
  • Photographic evidence
  • As-built drawings

Compliance Certification

  • Fire safety certification
  • Material compliance certificates
  • Installation warranty documentation
  • Hygiene compliance statement
  • Sector-specific certifications
  • Handover certificate

Health & Safety Documentation

  • Risk assessments (RAMS)
  • COSHH assessments
  • Method statements
  • Safety data sheets
  • Emergency procedures
  • Incident reports (if applicable)

Post-Installation Requirements

Client Handover

  • Cleaning and maintenance guidance provided
  • Warranty terms explained
  • Emergency contact details supplied
  • Spare materials provided (if specified)
  • Defects liability period confirmed
  • Maintenance schedule recommended

Ongoing Compliance

  • Regular inspection schedule established
  • Cleaning protocol confirmed
  • Maintenance requirements documented
  • Re-certification schedule (if applicable)
  • Contact for technical support provided
  • Future expansion considerations noted

Common Non-Compliance Issues to Avoid

Installation Errors

  • Inadequate substrate preparation
  • Incorrect adhesive selection or application
  • Poor welding technique (cold welds, gaps)
  • Misaligned panels and joints
  • Inadequate edge sealing
  • Damage to material surface

Documentation Failures

  • Missing material certificates
  • Incomplete installation records
  • Absent fire safety documentation
  • Inadequate photographic evidence
  • Missing as-built drawings
  • Incomplete handover documentation

Compliance Oversights

  • Fire barriers not installed
  • Hygiene standards not met
  • Sector-specific requirements missed
  • Building regulations not followed
  • Client specifications not addressed
  • Testing and verification skipped

NextGenClad Compliance Guarantee

At NextGenClad, we ensure every installation meets all applicable compliance standards through:

  • Certified Fitters - All installers trained and certified in leading hygienic cladding systems
  • Quality Assurance - Rigorous inspection and testing at every stage
  • Complete Documentation - Full compliance certification package provided
  • Sector Expertise - Deep understanding of HACCP, GMP, HTM 64, and ISO 14644 requirements
  • Project Timeline Guarantee - On-time delivery without compromising compliance
  • Ongoing Support - Technical assistance throughout the project lifecycle

Contact NextGenClad for Compliant Installation

Specialist Hygienic Wall Cladding Installation - Manchester & UK-Wide Service

This checklist is provided as a general guide. Specific project requirements may vary. Contact NextGenClad for a detailed compliance assessment for your project.

Document Version: 1.0
Last Updated: January 2025
© NextGenClad Ltd - All Rights Reserved

Chat on WhatsApp